JetExec Progress Pictures

JetExec Latest Progress Picture.
2014-03-07 - Out with John C. and my brother Todd, playing with the turbine.
2022-03-01 Fitting the new turbine cowl.
2022-01-24 Completed form for fiberglass turbine cowl.
2021-12-17 Building the form for a new fiberglass engine cowl.
2021-10-29 Completed JetExec 100 hr maintenance. Re-shimmed main rotor hub from 0.008" to 0.0004" TIR, with noticeable improvement in main rotor smoothness!
2021-10-15 Replaced RW and KISS bearings with AMI UKX10+HE2310 and taller aluminum thrust tube. With the new, tighter taper-lock inner race, main rotor shaft runout at the hood bracket is now only 0.0002" TIR!
2021-09-24 Added AMI HE2310 taper-lock to tighten top end of MRGB spool on mainshaft.
2021-09-02 Drawing of current setup with stock RotorWay Fafnir top bearing and KISS thrust bearing (on left) shows that 1° hood bracket/flange tilt causes KISS bearing to lock with the Fafnir inner race. Want to replace these with the AMI taper-lock bearing and longer thrust tube shown at right.
2021-08-24 On earlier flight, noticed occasional slight main rotor vibration. Investigated, found that Rotorway top bearing, KISS thrust bearing and thrust tube were all spinning on mainshaft?
2021-06-10 Sitting in the hanger, ready to GO!
2021-02-28 MRGB ready to install.
2021-01-14 New improved gears for the MRGB.
2019-10-29 Speedway Q.Q. rear end (spare part MRGB).
2017-10-31 Cascade ID Airport, U70
2017-08-21 High Valley back country airstrip ID35 for the total solar eclipse. Amazing!
2017-03-27 M/R blades balanced to within 1/16" level, 0.1g.
2017-03-25 M/R blade static balance using water level reference tubing.
2017-03-22 Repainted M/R blades this winter, with bare leading edge.
2017-01-27 T/R Pitch Link Safety Wiring.
2015-09-27 New flexible coupler installed between oil pump and M/R shaft. (See Oil Cooling System.)
2014-07-01 Added trim tabs with Gurney flaps to horizontal stabilizer.
2014-05-29 Back after the first few flights around the pattern.
2014-04-30 Homer.
2014-04-19 Ready for hover testing.
2014-04-11 Installed new EGT probe.
2014-03-24 Modified T/R gearbox vent.
2014-02-26 Outside for the first turbine start.
2013-11-05 M/R blades installed.
2013-11-05 Painting the M/R blades.
2013-10-19 M/R mast installed.
2013-10-04 Lowering in the M/R mast.
2013-09-13 In the Hanger at EUL (Caldwell, Id.)
2013-08-03 On the trailer and down the road.
2013-08-02 Moving it out of the shop.
2013-06-23 View from above the tail boom forward.
2013-06-08 Final fitting the aft body panels.
2014-03-28 Longer T/R pitch links.
2013-06-04 Installed T/R blades and temporary (too short) control links.
2013-06-01 Installed turbine exhaust sweep.
2013-05-12 T/R Gear Box drive shaft, u-joint and actuator connections.
2013-05-08 My brother Todd helped attach the tail boom.
2013-04-19 Balancing the Main Rotor Blades.
2013-04-14 Main Rotor Blade Straps attached.
2013-03-24 Cabin Interior Liners installed.
2013-02-09 Cabin electrical, air completed.
2013-02-03 Door hinges.
2012-11-07 Windscreen installed, fuel tank fill and vent completed.
2012-11-07 Pedal boots installed, ready for windscreen.
2012-10-23 Fiberglassing the windscreen.
2012-10-11 Cabin air fan and inlet air filter box.
2012-08-19 Fuel shutoff valve installed.
2012-08-06 Seats and belts installed.
2012-06-30 Interior painted and instrument panels installed.
2012-05-27 Firewall insulation on seat back.
2010-03-10 First solo in an R22.
2006-09-15 First turbine light-off.
2006-01-03 Lowered the turbine. Thinking about attaching the tailboom to the exhaust and turing it into a NOTAR! (Just kidding.) (Well, maybe not.)

Last Updated: March 3, 2022